Planning to rent a pop-up shop in Brussels? Belgium’s standard commercial lease (bail commercial) is tightly regulated, but the rise of temporary shops has prompted lawmakers to adapt. Like Flanders and Wallonia, the Brussels-Capital Region now has a specific legal framework for short-term commercial rentals. Here is how it works in Brussels.

1. Rent a pop-up shop in Brussels: term and notice
In Brussels, you can rent commercial premises, or let them out, for a maximum of 1 year to test a pop-up shop concept. This flexibility suits temporary businesses. A major advantage of this short-term lease (bail de courte durée) is the freedom it gives the tenant: they can end the lease at any time, provided they give 1 month’s notice. For the termination to be legally valid, the tenant must notify the landlord through a bailiff (huissier de justice) or by registered letter.
2. Condition reports, deposit and costs
As with any rental, a short-term lease requires clarity about costs and the condition of the premises.
- The condition report (état des lieux): Reports are mandatory at both the start and the end of the tenancy. If the parties choose to appoint an expert to prepare them, they must split the expert’s fees equally.
- The rental deposit (garantie locative): A strict cap protects the tenant. If the landlord requests a deposit, it cannot exceed the equivalent of 1 month’s rent.
- Rent and property tax: Unless a written clause in the lease expressly states otherwise, the landlord cannot require the tenant to pay taxes relating to the building, such as property tax (précompte immobilier).
- Utility costs: The tenant alone is responsible for utility consumption costs, including water, electricity and gas.
3. Alterations and building work: what is allowed
A pop-up shop often needs a custom fit-out. Unless the lease prohibits it, the law allows you, as the tenant, to make any alterations useful to your business. There are, however, three limits: the work must not compromise the building’s safety, cleanliness or appearance.
The procedure is specific: the tenant must inform the landlord of the planned work by registered letter before work begins. The landlord then has 10 working days to object, provided they have legitimate grounds. If they do not respond within that period, they are legally considered to have agreed.